A proposal explains what the client is buying, not just what it costs
You did the hard part. You walked the job, measured, priced every line and checked your margin. Then it all gets squeezed into a one-page bid that says “Bathroom remodel: $16,400,” and the client compares it to a competitor’s $13,900 that includes half the work. You lose the job to a cheaper bid that was never the same job.
Contractor proposal software fixes that by turning your estimate into a document the client can actually decide on: what is included, what is not, which option they are choosing, what it costs and how they say yes. This guide shows what goes into a proposal clients accept, with a complete example. We make one of these tools, EstiMate, and there is a short overview of it at the end.
What belongs in a proposal clients accept
Seven parts. Leave one out and you will hear about it later:
- Who and where.Your company, the client and the property address. Sounds obvious, until a template carries last month’s client name.
- The scope, in plain words.Room by room: what stays, what gets replaced, what gets repaired, and the preparation, removal, disposal and cleanup that go with it.
- The options.If you offer choices, each one written out item by item, with its own price.
- Allowances.An allowance is the amount included for an item the client has not chosen yet. State it, and the rule if they pick something pricier.
- Exclusions.What is not in the price, in plain words.
- Payment and terms.When money is due, how long the price is good for, and how changes are handled.
- How to say yes.One clear way to accept, ask a question or request a change.
Photos help when they explain the scope: the cracked tile you are replacing, the vanity that stays. They hurt when they are thirty random shots that bury the decision.
Example: a hall bathroom proposal, written out
Here is what that looks like on a real-sized job. Prices are illustrative; the structure is the point.
| Option | What is included | Price |
|---|---|---|
| Good Refresh | Keep the tub and wall tile. Regrout and recaulk, new vanity top and faucet, new toilet, new light and mirror, patch and paint. | $9,800 |
| Better Replace | Remove tub and surround. New tub and tiled surround, new stock vanity, toilet, vinyl plank floor, light, mirror, exhaust fan, paint. | $16,400 |
| Best Upgrade | Convert tub to a tiled walk-in shower with glass door, semi-custom vanity, tile floor, upgraded fixtures and lighting, exhaust fan, paint. | $27,900 |
In every option: replace the soft subfloor at the toilet (about 16 sq ft) and add GFCI protection to the vanity outlet. Required repairs are not optional extras.
Allowances: floor tile in Best at $6 per sq ft material for 45 sq ft ($270 included). A pricier tile is added at the difference, by change order.
Not included: work outside the bathroom, permit fees unless listed, client-supplied fixtures, and concealed conditions found once walls or floors are opened. Those are priced when found, before the work is done.
Payment: deposit at signing, a progress payment when rough plumbing and tile backer are done, and the balance at the final walkthrough. Check your state’s rules on deposits before you set yours; some states cap them. California, for example, limits most home-improvement down payments to $1,000 or 10% of the contract, whichever is less.
Good for: 30 days. Material prices move, so the date protects you.
Notice what this does. A client comparing your Better option to a cheaper bid can now ask the other contractor: does yours include the subfloor, the exhaust fan and the disposal? That question wins jobs.
Options sell jobs, if they are written out
Three options beat one price almost every time. The client stops asking “is this too expensive?” and starts asking “which one do I want?” That is a much better conversation to be in.
The trap is the label. “Better” means nothing on its own. Write each option out item by item, keep the required repairs in all of them, and let the client mix: a Best primary bath and a Good hall bath is a perfectly good plan. Describe the mix as it is, rather than forcing it into one package name.
What the client sees, and what stays yours
The client needs the work and the price. They don’t need your markup, your labor rate or your supplier costs. Decide what you show, and keep the internal pricing internal. What you can’t hide is the scope: the more specific it is, the harder it is for anyone to undercut you with a vague bid.
The pricing math behind the number, including why a 20% markup is not a 20% margin, is in remodeling estimating software.
Send it, then keep the versions straight
Before you send, check four things: the recipient, the current version, the option shown and the total. Then remember that sent, viewed and accepted are three different events. A proposal that was opened twice and never answered is a phone call waiting to happen, not a yes.
Clients change their minds. When they swap a finish before signing, revise the proposal and make it obvious which version is current. The worst negotiation in the world is the one where the price comes from version two and the scope comes from version three.
Once the job is signed, new work is a change order, written against the signed scope. That is its own discipline, covered in change order software for remodelers.
Test any proposal tool in 20 minutes
- Start from an estimate.The proposal should come out of the scope you already built, not a blank page.
- Build three options.Good, Better and Best, each written out, with the required repair in all three.
- Change one finish.The price and the scope should both update, and the old version should still be there.
- Read it as the client.Could someone who has never remodeled a bathroom tell what they are buying?
- Send it to yourself.By email and by text. Is that what you want a client to see?
How EstiMate handles this
Here is how EstiMate covers what this guide describes:
- From scope to proposal. The proposal comes out of the same scope you priced: same lines, quantities and finish choices, with your company on it.
- Finish options. Cosmetic, Standard or High-end per item, per room or for the whole job, saved as named versions you can compare.
- The money, line by line. See exactly where the money goes before you send the quote.
- Send it. Proposals and reports go out by email or text, with the photos organized by room behind every number.
Here are those screens, working. Tap them, or press a “try me” flag where you see one:
EstiMate is on Android today, with iPhone coming soon. Try it free for a week from your first property.
Change the rehab level. Watch the number move instantly.
Know exactly where the money goes before you send the quote.
1234 Oak Street
CONTRACTORTurn the entire walkthrough into something you can send.
Every number can go back to the room where it started.
Get the next guide like this one
Step-by-step guides, worksheets and templates for wholesaling and investing, sent when they’re published. Only when there’s something useful to send, and one click to unsubscribe.
We sent a one-click confirmation link — open it and new guides will start arriving. If you’d also like a free REILink account, you can create one in a moment. You’ll get:
- The REILink community
- Free calculators and tools
- Resources, contracts and legal documents
- Free education
- First access to new software to test, samples and specials
Free, no card needed.
Sign in any time at reilink.com with your email and the password you chose. New guides will arrive in your inbox.
New guides will arrive in your inbox. If you ever want the free account, it’s at reilink.com.
Questions
Is proposal software the same as estimating software?
They work on the same scope. Estimating is how you price the work; the proposal is how you present it so the client can decide.
Should I give clients options?
Usually, yes. Three written-out options turn “is this too much?” into “which one do I want?” Keep required repairs in every option.
Should the client see my markup?
That is your call. The client needs the work and the price; your markup, labor rates and supplier costs can stay internal.
How long should a proposal be valid?
Long enough for the client to decide and short enough to protect you from material price changes. Thirty days is common.
How much deposit can I ask for?
It depends on your state. Some states cap home-improvement deposits; California, for example, limits most to $1,000 or 10% of the contract, whichever is less. Check your state’s rules.
What happens when the job changes after signing?
Write a change order against the signed scope: what changed, why, the price and the client’s approval, before the work is done.